
Nearly 2,000,000 sq ft of completed framing in under 18 months of operation.
SWAP IN APPROVED PROJECTS & PHOTOS

FrameTec supplied the entire package on this five-unit multifamily building, through to the LP SmartSide exterior. Charcoal board-and-batten with white trim, gabled entries, finished and occupied.
A complete build framed in three weeks to the day. The speed claim lines up exactly with the “frame up to 75% faster” message on the home page, which makes it worth rescuin


A Dusty Robotics field print laid down by Cole Driescher, detailed to the shower soap niche, then framed into a standing house roughly a week later.
Tolko T-Tec LSL is now standard in every FrameTec wall panel exterior window rough opening. The shot frames the Sonoran foothills through a finished RO
