(833) 372-6383
Material overages, cutting mistakes, and site inefficiencies cost developers and contractors over $160 billion annually — not including time lost to delays and rework.
Our proprietary AI + robotics platform creates precisely pre-cut, ready-to-assemble framing systems in a climate-controlled facility — no guesswork, no weather delays, no on-site measuring errors.
The U.S. construction industry produces over 600 million tons of waste every year, more than double the total municipal waste. This leads to skyrocketing landfill costs, environmental strain, and wasted resources.
With advanced material optimization algorithms, FrameTec reduces framing waste to less than 1% — eliminating dumpsters, cleanup crews, and costly overruns.
Traditional framing takes 6–10 weeks on average — often longer with weather, scheduling, or material issues. Delays cost developers millions in interest, missed rental income, and reputation.
What takes 6–10 weeks with traditional framing, FrameTec delivers in 10–14 business days — from design to delivery, ready for assembly. That’s up to 75% faster framing and weeks of time savings.
As of this year, the construction industry faces a nationwide shortfall of 430,000 skilled workers, leading to project delays, cost overruns, and safety issues.
No more relying on unpredictable labor markets. Our pre-cut frames can be assembled by 2–4 general workers, no special tools or experience required — saving you thousands per project.